Get A Free Quote

Project

More Than 20 Professional Technicians Service for You

A world’s top 500 photovoltaic enterprise 25GW/h photovoltaic module installation project

2025.03.18

The project provides cooling support for the company's PV module production equipment, ensuring stable equipment temperatures during the production process as well as providing cooling water for the air-conditioning system to regulate the temperature of the production workshop and office areas.

Equipment used in the project: HON MING open cross-flow cooling tower

Home Product Service Contact