According to the number in the list, string the left and right filling pieces into the filling frame cross arm separately, and then fix them with screws at both ends;
Pay attention to the structure of the filling sheet, Its two ends are the air inlet section and the water collection section. The air inlet section contains a special resistance buffer structure that can be distinguished from the water collection section;
The filling is installed layer by layer in order from top to bottom;
After the filling is installed, the whole is inclined with the lower part facing the inside of the tower;
Pay attention to the installation direction of the filling sheet, and ensure that the air inlet section of the filling sheet faces the outside of the tower.